Kenya power employees remove power cables from the Globe Roundabout on March 15, 2026/EZEKIEL AMING'A
Workers from Kenya Power have begun removing power cables at the Globe Roundabout as repair works get underway at the busy junction.
The activity follows damage to electrical infrastructure after recent disruptions in the area. A lorry was seen dumping stones at the roundabout as part of preparations to rehabilitate the road section.
Globe Roundabout closed for repair works/EZEKIEL AMING'A
A lorry disposes stones at the Globe Roundabout, which is set for repairs.EZEKIEL AMING'A
The Kenya National Highways Authority had earlier announced partial closure of sections of roads around the Globe Roundabout to allow repair works on the Nairobi River bridge.
A Kenya power employee tries to remove a power cable that had been swept away by heavy rains last night/EZEKIEL AMING'A
Road closed at Globe Roundabout for repair works/EZEKIEL AMING'A
Kenya Power employees salvage a power cable in Nairobi river that was swept away by heavy rains last night. EZEKIEL AMING'A
Road closed at Globe Roundabout for repair works/EZEKIEL AMING'A
To ease traffic flow during the repair period, the authority has directed motorists to use alternative routes.


Traffic from Kipande Road heading to the CBD has been advised to use Limuru Road via the Fig Tree junction before joining Prof Wangari Maathai Road.